Marina of Pylos

Rolling Ahead / Infrastructure

The marina of Pylos is located on the North-eastern part of the coastal zone of the City of Pylos. According to the new Development Plan, currently being reviewed by the authorities, the marina will have 129 berths for yachts with length from 8m to 30m. The land area of the marina has a surface of 31.195m2. According to the new Development Plan, the build-surface ratio will be 20% and the

Read More

Marina of Thessaloniki (Aretsou, Kalamaria)

Rolling Ahead / Infrastructure

The marina of Thessaloniki (or marina of Aretsou) is located on the southern side of the coastal zone of the municipality of Kalamaria, in an area called “Mikro Emvolo”, only 7km away from the center of Thessaloniki. The marina offers today 242 berths for yachts up to 30 meters of length. The land area of the marina is 77.825m2. The tender procedure for the selection of the preferred investor

Read More

Olympic Assets

Rolling Ahead / Land Development

As a part of its strategy to utilize the Olympic Venues (properties built in order to house the sporting needs of Athens 2004 summer Olympic Games), HRADF promotes the development of the Equestrian Centre in Markopoulo and the Rowing Center in Schinias, through a long term concession of the right of their use and exploitation. Olympic Equestrian Center of Markopoulo 

Read More

Possidi, Chalkidiki

Rolling Ahead / Land Development

The Greeks, especially those who live in the Northern part of Greece, consider Chalkidiki one of the most popular summer tourism destinations. Apart from the locals, during the last years Chalkidiki has attracted many tourists from the Balkan countries and from Russia, while the trend is expected to continue in the near future. It is well known for its exquisite mountainous landscape, for its lush green forests

Read More

Public Power Corporation

Rolling Ahead / Corporate

Public Power Corporation S.A. (PPC) is the biggest power producer and electricity supplier in Greece, with approximately 7.4 million customers. PPC holds infrastructual assets in lignite mines, power generation, transmission and distribution. PPC’s current power portfolio consists of conventional thermal and hydroelectric power plants, as well as RES units, accounting for approximately 68% of the country's total installed capacity. PPC is listed on the Athens and London Stock Exchange.

Read More

South Kavala Natural Gas Storage

Rolling Ahead / Infrastructure

The project is related to the conversion of the depleted offshore natural gas field of South Kavala to the country’s first Underground Gas Storage (UGS) facility. Preliminary planning refers to a capacity of approximately 950 mcm, ~350 mcm of which are recoverable at an injection rate of 5 mcm/d and an extraction rate of 4 mcm/d. At present, the South Kavala gas field in the Thracian Sea is in use by Energean O

Read More

Thermal Springs

Rolling Ahead / Land Development

Wellness & Thermal Tourism Greece is endowed with natural mineral springs and geothermal waters which form an integral part of the country’s national wealth. Their therapeutic properties are well recognized ever since ancient times, offering opportunities to treat various ailments in a natural way (hydrotherapy). Thermal springs have long been associated with improving mental and physical health

Read More